Check.
Trim out linen closet & begin priming everything.
Check.
Things still left to do:
- install linen closet doors
- install 2nd faucet (when it finally arrives)
- prime walls
- paint all trim
- track down crystal dummy knobs
- connect bathroom fan
- wallpaper
- make & install shelving
Little by little, we'll check off the list. I'm praying my patience holds out.
Check.
Things still left to do:
- install linen closet doors
- install 2nd faucet (when it finally arrives)
- prime walls
- paint all trim
- track down crystal dummy knobs
- connect bathroom fan
- wallpaper
- make & install shelving
Little by little, we'll check off the list. I'm praying my patience holds out.
2 comments:
Looking good!!
I am so behind on commenting, but I promise I have read everything. Your house is looking amazing! The post about the bathroom was incredible. I cannot believe the transformation. I promise to be more timely with my comments!